Installations

WWTP Arroyo Quiñones (Madrid)

130 kW electrical
224 kW thermal
2 x Capstone CR65 BIO Digester 

Biogas fuel from digestion
Hot water production for the digesters
Complete biogas treatment unit
Control and data acquisition system
Anti-spill system 

Turnkey project

Téxtil Tinamar (Portugal)

600 kW electrical
1.180 kW thermal
4,00 t/h vapor (with 2.000 kW of post combustion)
1 x Power Package Capstone C600S 

LNG fuel
Heat production in two stages:
Process steam
Hot water for process 

Power package supply

WWTP Vallbona d’Anoia

65 kW electrical
130 kW thermal
1 x Capstone CR65 BIO Digester 

Biogas fuel from digestion
Hot water production for the digesters
Complete biogas treatment unit
Control and data acquisition system
Central control remote

Turnkey project

WWTP Pineda

390 kW electrical
500 kW thermal
6 x Capstone CR65 BIO Digester 

Biogas fuel from digestion
Hot water production for the digesters
Complete biogas treatment unit
Control and data acquisition system
Central control remote 

Turnkey project

WWTP Banyoles

130 kW electrical
240 kW thermal
2 x Capstone CR65 BIO Digester 

Biogas fuel from digestion
Hot water production for the digesters
Complete biogas treatment unit
Control and data acquisition system 

Turnkey project

WWTP Terrassa

520 kW electrical
600 kW thermal
8 x Capstone CR65 BIO Digester 

Biogas fuel from digestion
Hot water production for the digesters
Complete biogas treatment unit
Control and data acquisition system 

Turnkey project

WWTP Mataró

325 kW electrical
425 kW thermal
5 x Capstone CR65 BIO Digester 

Biogas fuel from digestion
Hot water production for the digesters
Complete biogas treatment unit
Control and data acquisition system

WWTP Sitges

130 kW electrical
240 kW thermal
2 x Capstone CR65 BIO Digester 

Biogas fuel from digestion
Hot water production for the digesters
Complete biogas treatment unit
Control and data acquisition system 

Turnkey project

WWTP Estrella Levante

95 kW electrical
Without thermal recovery
1 x Capstone CR65 BIO Digester
1 x Capstone CR30 BIO Digester 

Biogas fuel from digestion
Complete biogas treatment unit
Control and data acquisition system 

Turnkey project

WWTP La Llagosta - RENTING

95 kW electrical
Without thermal recovery
3 x Capstone CR65 BIO Digester 

Biogas fuel from digestion
Complete biogas treatment unit
Control and data acquisition system 

Plug&Play assembly for rent

WWTP Abrera

325 kW electrical
425 kW thermal
5 x Capstone CR65 BIO Digester 

Biogas fuel from digestion
Hot water production for the digesters
Complete biogas treatment unit
Control and data acquisition system
Central control remote 

Turnkey project

WWTP Igualada

390 kW electrical
455 kW thermal
6 x Capstone CR65 BIO Digester

Biogas fuel from digestion
Hot water production for the digesters
Complete biogas treatment unit
Control and data acquisition system
Central control remote

Turnkey project

Anglès Textil (ANTEX)

1.000 kW electrical
1.125 kW thermal
1,12 t/h vapor (734 kW thermal)
391 kW hot water
1 x Power Package Capstone C1000 

LNG fuel
Heat production in two stages:
Process steam
Hot water for process 

Power package supply

WWTP Blanes

130 kW electrical
240 kW thermal
2 x Capstone CR65 BIO Digester 

Biogas fuel from digestion
Hot water production for the digesters
Complete biogas treatment unit 

Supply of the Microturbines and the BTU

Finca Mouriscade

30 kW electrical
65 kW thermal
1 x Capstone CR65 BIO Digester 

Biogas fuel from slurry digestion of a livestock farm
Hot water production for the digesters
Complete biogas treatment unit

Supply of the Microturbines and the BTU

WWTP Palamós (Girona)

130 kW electrical
217 kW thermal
2 x Capstone CR65 BIO Digester

Biogas fuel from digestion
Hot water production for the digesters
Complete biogas treatment unit
Control and data acquisition system
Anti-spill system

Turnkey project

WWTP Lloret (Girona)

135 kW electrical
222 kW thermal
2 x Capstone CR65 BIO Digester + 5 kW Photovoltaic Pergola

Biogas fuel from digestion
Hot water production for the digesters
Complete biogas treatment unit
Control and data acquisition system

Turnkey project

WWTP Boadilla (Madrid)

65 kW electrical
120 kW thermal
1 x Capstone CR65 BIO Digester

Biogas fuel from digestion
Hot water production for the digesters
Complete biogas treatment unit
Control and data acquisition system

Turnkey project

WWTP Heineken (Valencia)

130 kW electrical
2 x Capstone CR65 BIO Digester

Biogas fuel from digestion
Complete biogas treatment unit
Control and data acquisition system
Anti-spill system

Turnkey project